Permits and reviews

Atlanta Deck Permits

Worried a permit will hold up your deck? Know which reviews apply before you build so nothing has to come back down.

Call (470) 427-9259
  • When a permit applies
  • Historic and tree reviews
  • Nearby city rules
Contractor marking ledger placement and joist layout on a house wall

When a Deck Needs a Permit

Joist hanger and structural hardware at a beam-to-post connection
Footings and framing are what inspectors look at

Most new decks in Atlanta need a building permit, and so does structural work on an existing one. Replacing only the surface boards may not, but check before assuming.

Inside city limits, residential permits go through the Office of Buildings. Simpler decks may qualify for its Express review.

For help getting a deck built, call the number above. The builder you reach can tell you what your project needs.

Reviews That Can Apply Too

Historic Districts

In city historic and landmark districts such as Grant Park, Inman Park, West End and Cabbagetown, exterior changes go through Urban Design Commission review.

Trees

The city updated its tree protection ordinance in 2025. Removing protected trees needs a permit, so plan the deck around large trees where possible.

HOA Rules

Many subdivisions have their own design approval, separate from the city.

Setbacks

How close a deck can be to property lines depends on zoning.

Atlanta Deck Permit Rules in Nearby Cities

Each city runs its own permit office, and the rules differ:

  • Sandy Springs: decks more than 6 feet above grade need sealed site plans.
  • Brookhaven: deck permits need scaled drawings and DeKalb County easement approval.
  • Dunwoody: permits go through Community Development, and trees inside the 75-foot stream buffer need a removal permit.

Unincorporated areas follow county rules.

Not sure what your deck needs? Ask a local builder.

Call (470) 427-9259

From Application to Final Inspection

The steps vary by city, but most deck permits follow the same path:

  • Drawings and site plan. The builder prepares plans showing the deck's size, height, framing and location on the lot.
  • Review. The permit office checks the plans and may ask for changes.
  • Permit issued. The permit is posted on site before work starts.
  • Inspections. Footings, framing and a final inspection are typical.
  • Closeout. Once the final inspection passes, the permit is closed.

Ask the builder who handles each step, so nothing is left for you to chase.

Paperwork Questions

Do I need a permit to replace deck boards?

Replacing only the surface boards may not need one, but structural work usually does. Check with the builder or the permit office.

Who applies for the permit?

Ask the builder how they handle it when they quote the job.

What if my house is in a historic district?

Exterior changes in city historic districts go through Urban Design Commission review before the building permit.

What happens if I build without a permit?

Unpermitted work can lead to fines, required changes, or problems when you sell.